FROM GREEN TO BROWN

Howdy Y'all!

It has been a week since we last posted a blog update, and yes, we spent all day last Monday basking in the sunshine of the Seattle Seahawk's Super Bowl win! What a great game (somewhat of a surprise re the score!). But, a win is a win. Now for 2015!


Back at the ranch, we are still having yo-yo weather between really cold days, and days where we are wearing shorts; what a crazy winter this has been so far. But, little things continue to happen pulling progress along. 

The stone masons (aka The Stone Guys) continue to show up, chipping and laying stone in 40 degree weather (I wouldn't!), converting the green walls to brown stone; we are thankful for their persistence. Stone by stone, yard by yard, they continue to make progress. Since we are at the house most of the time, we've gotten to know each wall of the house intimately as they begin and finish a section. The front of the house is almost done, but a wrong sized lintel over the front arch has slowed the finish there, and we are waiting for a new one. (We do remember our lesson in "lintels", right?)
Front of the house (almost done!).
Master Bedroom main window.
Master Bedroom and Utility Room walls.
Master Bedroom second window and walkway.
The stone masons have finally moved underneath the patio cover to start the window arches. (Once these are done, that only leaves six more arches!!) These aren't exactly time-lapse photos, but they show the progression of change over a week's time.

Setting up the wooden window arch templates on patio.
Finishing the 'eyebrow' treatment on the windows.
Starting the Breakfast Area window stone.

Finishing the walls behind the outdoor kitchen area.
Moving inside, the Tile Guys have started work in the Master Suite bath, with the first tile on the bathroom floor, and one wall tiled in the master shower area. There is quite bit of tile work in this room, so we think they'll be here for awhile.


The center platform is where the master tub will sit (recessed in) once it arrives and is installed. (I tried to convince Jan it would be a cool throne stand for me, but she wasn't buying any of it.)
Floor tile without the accent pieces.
Master shower faucet wall tile.
Master shower back wall.














Beginning of the shower/bathtub wall tile.
The finish carpenters (James and Buddy) have been busy working on small, but important, aspects of the house. The beams were finally completed in the master bedroom and now await The Paint Guy to apply a final stain finish.
Beams in the Master Bedroom. 
(No, they aren't bent. Weird camera angle.)
Additionally, the beams in the Great Room ceiling are waiting to be stained first before being raised to the ceiling. Because of the height of the ceiling, and already painted walls, the builder elected to stain the beam material first, then build the beams. Smart move.

While they wait for the staining to be completed, the carpenters are creating the arched frames for the three windows at the top of the Great Room. This again requires building the arches from individual strands of wet alder wood, gluing, forming, nailing, and sanding the arch around a mould. Unfortunately, one mould can't be used for all three because the windows are not absolutely and exactly alike, even though they are very close in absolute measurements (my head hurts thinking about this arch stuff again). 
Building each window mould separately.

We are starting to see some preliminary cleanup taking place - mostly removing excess concrete, and leveling the dirt berms from the pool dig. We can now actually see over the edge of the pool from the house without having to view a bunch of dirt mounds.

View from the rear field.
But Wait, There's More!
Our ranch neighbors, Jerry and Cindy, have some friends visiting this weekend and joined us for a visit to the house and, a romp around the neighborhood.
Cindy (left), Connie (aka, The Friend), and Jerry.
Herding cattle the modern way.
Feeding Firecracker some "candy" alfalfa cubes. 
That's all for now. See ya later!
- Jan and John - 

Wednesday, January 29, 2014

JUST PLUGGIN' ALONG

Howdy Y'all!


This week has been one of sporadic progress mostly focused on completing the front stone exterior of the house. It has also been punctuated by some erratic winter weather (yes, it happens in sunny Texas) where temperatures have yoyo'ed up and down sufficiently to disrupt the stone work. Cement mortar doesn't work well in sub-40 degree weather, and neither do the stone masons. Hopefully the disruptive weather here in Central Texas is over for the time being and we can get back to a steady stream of work.

Most of the visible effort has been in stone work on the remaining front arches and window treatments. It isn't surprising how painstakingly slow this work seems, yet arches are getting finished. This picture below is the outside left-hand arch/wall in the front entrance. The cup is an added detail we considered. :D

Left-side front entrance arch and wall.
Same wall - inside arch and wall.
Since we have four masons on the job, more than one wall can be worked on. The trick is not to have too many masons working on the same house because stone placement starts to look 'individualized', or distinctive to a mason. We've been fortunate in that the four have somewhat the same 'eye' regarding the size and mix of stones. (Also lighter on the fried chicken pocketbook.)
Work on the Dining Room window arch.
Finishing the arch.
Done except for the ledge stone at the bottom.
We also saw some work on the pool last week as the pot scuppers were installed on the rock columns. These will add sound and a 'visual' as water (theoretically) pours out of the pots into the pool. Pool water can get stagnant, particularly in hot weather, so these types of water effects keep things flowing when the pumps are on and significantly minimize the amount of chemicals needed. Hopefully, with rainwater and the water effects, we can use the very least of pool chemicals to keep the water balanced and safe. This is also the last of the pool work that will be completed until the house is completely done. At that point they will apply the deck finish, the final plaster coat, and color for the pool.
Pot Scuppers.
Demysticizing the simple technology of the pots.
Outside progress also continues in shaping the motor court  garage area in preparation for laying cement to bring the level even with the garage floors. The foundation team returned to start building the forms for the back retaining wall which will support the motor court foundation. The pad for the air conditioning compressors also was formed next to the pool equipment pad. 
Retaining wall at the back of the Motor Court.
Supervising the forms for the air conditioning compressor pad.
Additionally, our 1000 gallon propane tank was finally delivered and set on its' sand base. (Looks like a Red October submarine!) The tank will have a couple of gas lines installed this week for the house and pool heater (later addition) and then buried completely (like the septic system).
Propane tank
Different view
Buried! (almost)
The next big step inside the house is the painting and installation of the cabinets that have been built-to-measure for the house. We have elected to turn the detached garage into a paint booth rather than having the cabinets painted in the house, as is generally customary. In this manner the painters can control the environment with dust removal equipment and heaters. The cabinets have started to arrive from the cabinet maker, and as soon as the closed garage setup is weather-tight with vinyl wall coverings, we'll start to see finished cabinets.
A small sample of the cabinets waiting to be stained and finished.
A variety of other activities are happening as well as the builder starts the final push to completion. The electricians arrived today to start putting in electrical plugs, lights, cans, fans, switches, etc. (Not sure what the rush is since we don't have power to the house yet, but hey, we're not the project managers.) 
Ceiling cans.
Ceiling fan for Office/Den.
Outdoor garage lamps.
More outdoor garage lamps.
Power distribution panels and new rainwater collection lines.
That's all for now. See ya later!
- Jan and John - 

Monday, January 20, 2014

THE UNVEILING!

Howdy Y'all!

This is probably a good time to thank you for your continued support and positive comments about the blog. When we started this, it was a way for us to memorialize the building process and build a story around this house project, and to consolidate all of the responses to questions we were getting about "how is the house project going?". But, along the way it turned into a stress-relieving vehicle for us, and gave us a positive outlet for the invariable frustrations that come with building a house into a home. So, thank you all!


Of course, just as soon as we sent off the last blog, lots of things started happening around the house. Yessiree, things have picked up! 


Most notably, the stone masons have reached the halfway point in their efforts to kill off all of the stone piles. The entire front of the house is almost complete, except for the front entrance. They have almost completed the garages so that we can begin constructing the forms to pour the motor court wall and driveway. Garage doors are slated for next week, so the clock is ticking to get the rock up there.
Powder Room exterior wall. Done!
As we watched today, quite a bit of rock work was done after the setting of the transom beams over the garage doors.
Starting the base level.
Here is an example of the iron "L" beam (lintel) that was set above the doors to act as a 'ledge' on which the rock will sit. This puppy weighed 300 lbs. and took five of us to get it in place. Once positioned on the stone columns at the ends, it was bolted into the transom beam, and can now pretty much support any stone weight from above. Clever, simple technology that is pretty standard for stone-faced garage doors.
Placement of the L beam (lintel).
The finished look.
Side view of the main garage.
Part of the complexity of the stonework, and the length of time to get it completed, is the number of arches we have on the exterior of the house. To be honest, Jan and I were simply not aware, during the architectural design phase, of what that really entailed, and the amount of detail involved to get the 'look' right. (None of our previous homes had arches.) Having said that, it isn't an uncommon stone process here, so the craftsman are familiar with what it takes to set the stone properly. In our case, and those of other ranches here, wooden templates have to be constructed for each individual arch in order to set the top stones properly. Like Roman aqueduct architecture, the smaller arches can literally support themselves and the weight above, but the larger arches need the lintel steel beam technology. 
One of the patio arch templates.
View of multiple wooden templates built for each patio and window archway.
Window templates for the front entrance arches above the door.
Wooden arch template (inserted) for the Media Room fountain wall.
Meanwhile, back at the ranch….(always wanted to say that!), the Pool Guys were busy with the 'good and the bad'.     The Bad - we found a few tiles on the infinity edge that we weren't happy with (chipped), and a couple of stone scupper pot caps that we felt were substandard quality, so the pool guys were out replacing those today. To their credit, they also recognized the problems and moved to correct them before we asked to have them replaced. 
The Good - work started on building the fire pit on the lower deck. Do S'mores go with wine?

Laying the firebrick and exterior stone facing.
More of the same.
Note the steel lintel beam for the main patio arch. (Feels like St. Louis.)
The finished product just waiting for wood and fire.
(Shhhh. Jan thinks it's her new hot tub.)
And, finally, the unveiling of the trim paint began today that had been covered up while the room walls were being painted last week. Note that Jan and I were in Seattle when all of the trim work was being done, so today was the first opportunity to see it sans the plastic covering. Overall, it looks terrific! There are a couple of things that will go on the final 'punch list' for rework (there always are), but in general we are very happy with the color, finish and tone depth of the woodwork.
Great Room doors and window.
First look at the Great Room fireplace.
Prep Kitchen trim work.
Main Kitchen.
Master Bedroom windows and door.
Office/Den windows and door.
Either we made the pool too deep, or I'm getting shorter.
BUT WAIT, THERE'S MORE!

This is for all of the Seahawks fans out there (minus those who think Sherm Richard's comments were cool). 
Go Hawks! (Graphic courtesy of Beau Granger. Thanks, Beau!)
Super Bowl! Go Hawks!
That's all for now! See ya later!